ADNOC Al Zafarana service station (973)

Client:   ADNOC
Location:  973 Eastern Road - Hadbat Al Za`Faranah - E21 - Abu Dhabi
System Size:   142.7 KWp | 115 KW AC
Annual Energy:   150 MWhr
CO2 Emissions Prevented:   120000 KG CO2/Yr
Categories:  On-grid

Problem Definition:

• High operational electricity cost at ADNOC stations • Requirement for clean energy compliance • Need for fast execution at multiple sites • Strict ADNOC HSE standards • Need for accurate commissioning & performance testing

Solution:

• Deployment of skilled manpower & parallel execution teams • Systematic installation methodology for consistency • Strict adherence to ADNOC safety requirements • Efficient cable routing & quality installation • Full commissioning support including PR test & reporting • Clear communication & daily progress updates

System Overview:

Apex has successfully completed the installation of ADNOC solar stations 973 totaling 142.7 kWp, with high-quality workmanship, clean cable management, and strict adherence to HSE standards. All stations are ready for PR testing and final grid synchronization.

Site Assessment & Feasibility Study
Civil & Structural Work
Electrical Installation
Testing & Commissioning